广告位
产品详情
The Qinghai-Tibet Railway

The Qinghai-Tibet Railway starts from Golmud in Qinghai, passes through Nachitai, Fudaoliang, Tuotuohe, Yanshiping, the Tunggula mountain, and then ends at Lhasa via Amdo, Nagqu, Dangxiong, Yangbajing in Tibet autonomous region, with a total length of 1142 km, in which 960 km long railway is located at an area with altitude of 4,000m above sea level and another 550km long railway is running in permafrost region, crossing over the highest point of the Tunggula mountain with altitude of 5072m above sea level. The Qinghai-Tibet railway is the longest plateau railway with the highest altitude in the world.

CRAC was responsible for quality inspection and testing for bridge foundation pile, soft soil foundation, bridge pier, vertical bearing capacity of single piles at Lhasa station, pier body quality, subgrade and concrete compaction in steel arch.

This website copyright owned by China Railway Academy co., LTD.

Address: NO.97, Gunan Street, Western High-tech District,Chengdu City, Sichuan Province. Zip:611731

E-mail cragc@cragc.com.cn fax: (028)67580052

ICP:蜀ICP备15009224号-1


站长统计
脚注栏目